Bridge girders to be installed along McLoughlin during overnight construction hours

Construction crews will place 14 large steel girders for the Portland-Milwaukie Light Rail Project’s Kellogg Bridge over SE 22nd Avenue, SE Bluebird Street and SE River Road, west of SE McLoughlin Boulevard, between 7 p.m. and 7 a.m. Mon., Nov. 18, through Tues., Nov. 26.

Wastewater Manhole Replacement Program

Project Details

This program was created to ensure the replacement of all manholes within the Milwaukie Sewer System over the period of 150 years.

Alerts & Updates

Wastewater Main Repair Program (2014)

Project Details

Projects under the Wastewater Main Repair Program (WWMRP) generally consist of pipe replacement where structural or inadequate flow conditions exist and lining of pipes with excessive groundwater i

Alerts & Updates

ADA Ramp Enhancement 2013

Project Details

The Americans with Disabilities Act (ADA) ensures access to the built environment for people with disabilities.  The ADA Standards establish design requirements for the cons

Alerts & Updates

Downloads

Main Street repaving complete, Harrison Street reconstruction underway

Beginning on Mon., Sept. 30th, S-2 Contractors will close Harrison Street from Highway 224 to Campbell Street to begin reconstruction of this portion of the road. Be cautious when traveling through this area. DETOUR ROUTES HAVE BEEN SET UP TO DETOUR TRAFFIC AROUND THIS CLOSURE. PLEASE FOLLOW DESIGNATED DETOUR ROUTES.

Street Surface Maintenance Program - Slurry Seal (2013)

Project Details

Alerts & Updates

Section of Harrison Street to be closed for light rail work week of July 8

During summer and fall of 2013, a series of Downtown street and roadway closures will take place as several track intersections are reconstructed as part of the light rail project and the City performs a pipe replacement project.

The next closure: Harrison Crossing Closure: Monday, July 8, 7 a.m. through Monday, July 15, 7 p.m.
The road closure itself is in effect all hours of the day but the work crews are only allowed to work from 7 a.m. to 7 p.m. on weekdays, and 8 a.m. to 5 p.m. on weekends. Driveway accesses will be maintained for properties and pedestrian access will be provided on at least one side of the street.

Click here for a map detailing closure and detour route.

Weigh in on the County's Virtual Transportation Workshop Now!

Citizen members of a Public Advisory Committee (PAC) have been working with Clackamas County staff and technical consultants for over a year to identify more than 500 projects for roads, bridges, s

Street Surface Maintenance Program - Paving (2013)

Project Details

 

The 2013 program year of the Street Surface Maintenance Program (SSMP) reconstructed Harrison Street (from Highway 224 to Main Street) and overlaid Main Street (from Scott Street to Washington Street).

 